BEBuild Eastside
Public sample
Illustrative property feasibility report

Example Eastside ADU study

This sample shows how Build Eastside organizes an early property screen: what may fit, how the estimate was calculated, what the maps can and cannot confirm, and what to verify before design or permitting.

Eastside example, not a real addressProject: one new ADUConcept: attached or detached
Project overview

What this first pass tested

One new ADUTwo stories assumedNo garage conversionExisting buildings remain
Possible with confirmation

One new ADU appears possible in this illustrative example

The example has enough calculated floor area and building coverage for an ADU. A survey and site-specific review are still needed to prove that a legal, usable footprint fits between the house, setbacks, access, trees, easements, and other constraints.

Attached addition

Estimated footprint
Up to 600 sq ft
Two-story living area
Up to 1,200 sq ft

Example controlling limit: ADU living-area cap.

Detached ADU

Estimated footprint
600 to 800 sq ft
Two-story living area
Up to 1,200 sq ft

Example controlling limits: ADU living-area cap and practical placement.

01

Is an ADU allowed?

Screen the zoning district, dwelling count, and ADU form against the jurisdiction rules available for the address.

02

How large could it be?

Compare the local ADU cap with remaining FAR or GFA, lot coverage, and other applicable dimensional limits.

03

Could it fit on the lot?

Use mapped parcel and building context to identify a possible area, then state what still needs a survey or professional review.

Property capacity

How the estimate is supported

How these terms work →

A real report uses the property records and jurisdiction rules available for the submitted address. The practical estimate is controlled by the smallest applicable limit. Unknown inputs are identified for confirmation instead of being treated as a pass.

Illustrative lot area10,000 sq ft

Starting area used for this example only.

Existing building footprint2,400 sq ft

Synthetic house and garage footprint used in the sample.

Remaining lot coverage1,100 sq ft

3,500 sq ft example limit minus 2,400 sq ft existing footprint.

Remaining FAR / GFA1,500 sq ft

Illustrative floor-area capacity after the existing home is counted.

Example ADU size cap1,200 sq ft

The report compares jurisdiction rules with the capacity left on the lot.

Estimated two-story living areaUp to 1,200 sq ft

Controlled by the smallest applicable example limit, not by a target size entered by the homeowner.

Property maps

Parcel, terrain, and setback context

Real reports include saved map images when dependable public layers are available. These abstract diagrams show the type of context each map provides without depicting a real parcel or location.

Map 1

Parcel and building context

Helps compare the parcel outline, existing structures, access, and a possible area for further testing.

Map 2

Terrain and mapped constraints

Surfaces public topography and constraint layers that may change design, drainage, access, or the need for specialist review.

Map 3

Base setback context

Shows a preliminary setback screen. It does not prove a buildable pad, structure separation, or survey accuracy.

Public-record findings

What appears workable and what still matters

Capacity found

Calculated area remains for one ADU

The synthetic FAR / GFA, coverage, and ADU size limits support the example estimate shown above.

Needs site review

Area capacity does not prove placement

A survey must establish property lines and existing structures before setbacks, building separation, easements, trees, access, and a contiguous footprint can be confirmed.

Confirm locally

Utilities and private restrictions can change the plan

Sewer or septic capacity, utility routing, construction access, HOA documents, and recorded covenants are outside a basic zoning-area calculation.

Verification record

Sources and important limitations

Jurisdiction zoning codeADU eligibility and dimensional standards
County assessor recordsLot and existing-building information
Jurisdiction GIS layersParcel, building, terrain, and mapped constraints
Homeowner confirmationCorrections to available property information

A completed report links the exact public sources used for that address and records which facts came from public data or homeowner confirmation.

What this first pass does not replace

  • A current boundary and topographic survey
  • Title, easement, covenant, or HOA review
  • Geotechnical, arborist, civil, structural, or utility analysis
  • A code-compliant design, permit application, or city approval
Ready to check a real property?

Run a free feasibility study for your address.

Confirm the public property information, choose the project type, and receive a private first-pass report with the applicable calculations, maps, findings, sources, and next questions.

Start my feasibility study →