I expected permitting to be the worst part of building a house.

What I learned was simple. Permits can move quickly when someone watches every handoff.

Wilson, founder of Build Eastside
WilsonDad. Engineer. Lifelong Sims architect.

The warnings created more anxiety than the actual process.

I am a dad, an engineer, and someone who has always loved customizing things and figuring out how they work. I grew up designing houses in The Sims and obsessing over parks in RollerCoaster Tycoon. Building a real home in Bellevue felt like the grown-up version of the same curiosity—just with zoning, structural drawings, and much higher stakes.

I am building a custom home of roughly 6,000 square feet in Bellevue. The project has an unusual floor plan and difficult structural, civil, and site conditions. Before we submitted, architects, builders, and real estate professionals made city permitting sound miserable.

Our permit moved through in about three months. I checked for updates frequently, tracked which person or department had the next step, and followed up whenever progress stopped. It could have been faster if one civil engineering handoff had moved sooner.

That was my experience, not a promised timeline. Every project is different. It still showed me how much active follow up can matter.

The moment it clicked

Two nearby projects. Two very different timelines.

The difference was not simply project complexity. It was whether someone noticed when work stopped moving.

My projectAbout 3 months

A large custom home with unique design and site conditions. I checked for updates frequently and followed up at each handoff.

An individual result, not a benchmark.
A nearby projectAbout 1 year

The owner assumed work was moving. Architect revisions sat untouched for about three months until I suggested a follow up.

The added carrying cost exceeded $80,000.

The real bottleneck

Delay often lives between people.

Homeowners naturally assume the city or architect is working on the permit. We pay professionals, and it is their job. But project teams are busy, public records are hard to interpret, and a revision request or follow-up can sit quietly in someone’s queue.

This is not about blaming the city, architects, or engineers. It is about making responsibility visible. When you know who has the next step and how long they have had it, you can follow up before days turn into months.

Why Build Eastside exists

I built the tool I wished I had.

Build Eastside reads the public permit record, translates it into plain English, identifies who appears to be responsible, and watches for meaningful changes. The goal is simple: help homeowners catch preventable delays before they become expensive ones.

01Show the next action

A clear answer is more useful than another page of permit data.

02Alert without creating noise

Routine checks stay quiet. Meaningful changes and overdue handoffs do not.

03Be honest about the limits

Public data can be incomplete. Build Eastside helps you ask better questions; it does not replace your project team or the city.

Still early

Useful first. Business model later.

I am keeping permit lookup and monitoring free while I learn where Build Eastside can create enough value to become a sustainable service. Avoiding even one forgotten handoff can save a homeowner months of carrying costs.

From one homeowner to another

Know what your permit is waiting on.

Check a Bellevue or Kirkland permit for free. No account is required unless you want ongoing monitoring and email alerts.

Check my permit