BEBuild Eastside

Public building records

Where to find house floor plans and permit drawings by jurisdiction

Approved plans can reveal a home's permitted layout, dimensions, structure, site work, and design decisions. The useful trick is knowing whether your jurisdiction publishes the file directly or expects a focused records request.

Reviewed against official city and county sources, August 2026

This expands Build Eastside's original architectural-plans tip with current city links, more jurisdictions, and the limitations that matter before design.

What to look for

Start with the permit history, then look for the final approved architectural set, not just an early application drawing. Ask for the site plan, floor plans, exterior elevations, building sections, structural sheets, approved revisions, and final inspection or certificate record when those documents exist.

  • For design research, compare homes with a similar lot width, slope, orientation, view, garage approach, and program.
  • For a remodel, use the plans to understand likely framing and utilities, then field-measure and investigate before relying on them.
  • For due diligence, compare approved work with the house as it exists and check whether the permit received final approval.

Approved does not mean as-built

A permit plan shows what the city approved. It may not capture every field change, later remodel, owner alteration, or construction discrepancy. It also reflects the rules and engineering assumptions of its own permit date, not the rules for your project today.

Public access does not erase copyright. Use another project to learn from room relationships, circulation, structure, and site strategy; do not copy an architect's drawings into a new construction set. Your designer should create and coordinate plans for your property.

Jurisdiction directory

Download or search first

Jurisdiction directory

Search, then request

Bellevue: Bellevue Development Services recordsSearch the permit history, collect the permit numbers, then request the identifiable building permits, approved construction plans, land-use files, or clear-and-grade records through Bellevue's online records system.Clyde Hill: Clyde Hill permit portalUse the public permit portal to identify the permit and project year. If the drawings are not downloadable, submit a city public-records request that names the address and permit number.Issaquah: Issaquah property recordsSearch Issaquah permitting records or MyBuildingPermit first. The city says a public-records request may be needed to view documents and recommends calling the Permit Center to confirm what is available.Medina: Medina public records portalSubmit a focused request for the approved architectural plan set and related permit records. Include the property address, parcel number, permit number if known, project year, and preferred electronic delivery.Sammamish: Sammamish records guideSearch MyBuildingPermit by address or parcel first, then request the specific housing permits and plans. For pre-1999 projects, Sammamish directs requesters to King County; civil as-builts are in the Engineering Records Vault.Newcastle: Newcastle public recordsCheck the city Permit Center and document sources, then use the Public Records Portal for the plan set. Newcastle directs requests for pre-1994 building permits to King County.Woodinville: Woodinville construction permitsStart with the online Permit Portal and the permit number. Approved plans are delivered to applicants through the portal; other requesters should ask the Permit Center or use the city's public-records process for retained files.

Jurisdiction directory

Ask the local records office

A request that staff can fulfill

Use this five-step records workflow

  1. 1

    Confirm the regulating jurisdiction. A mailing city is not proof that the property is inside that city's limits.

  2. 2

    Search by both address and parcel number. Save every relevant permit number, project description, applicant, and year.

  3. 3

    Request specific identifiable records: the final approved architectural and structural plan set, approved revisions, site plan, inspection history, and final approval for the named permit.

  4. 4

    Include prior addresses when known, a reasonable date range, the parcel number, and a request for electronic delivery. Avoid asking for every record about a property unless you truly need it.

  5. 5

    Index the files by permit and date, then have the existing conditions field-verified before design or construction decisions.