The different types of permits in Hunts Point

Hunts Point publishes separate packets for building, mechanical, plumbing, site development, tree, right-of-way, shoreline, and land-use applications. Electrical permits come from Washington Labor & Industries and fire-sprinkler permits from Bellevue.

Guide updated September 11, 2026. Targets below retain their source-specific dates and definitions. Check the live city page for current workload.

On this page6 sections

Official starting point: Hunts Point permit packets. Match the full scope to the current city requirements before submitting.

One project can need more than one permit

A building permit does not automatically replace every trade, site, tree, fire, utility, right-of-way, or land-use approval. List the whole scope first, then confirm which reviews are combined and which require separate records.

The main types of permits

Building and demolition

Construction, structural work, and removal of structures.

Common examples: New homes, remodels, additions, decks, accessory structures, and demolition.Hunts Point permit packets ↗
Mechanical and plumbing

Town-issued trade permits.

Common examples: HVAC, gas appliances, water heaters, fixtures, and piping.Hunts Point permit packets ↗
Electrical and fire sprinklers

Handled outside the Town's standard permit packets.

Common examples: Electrical through Labor & Industries; fire sprinklers through Bellevue.Hunts Point permit packets ↗
Site development and trees

Excavation, grading, drainage, landscaping, utilities, and regulated vegetation.

Common examples: Site work, erosion control, tree removal, replacement, and construction protection.Hunts Point permit packets ↗
Right-of-way and shoreline

Work in public ways or near Lake Washington.

Common examples: Driveways, trenches, frontage, shoreline development, and exemptions.Hunts Point permit packets ↗
Land use and subdivisions

Planning decisions that may require notice or a hearing.

Common examples: Conditional uses, variances, boundary changes, plats, and subdivisions.Hunts Point permit packets ↗

How to choose the right combination

  1. Write the complete scope, including structural, system, site, tree, utility, access, and public-area work.
  2. Open the official source for every permit family that matches the scope.
  3. Check whether the primary permit includes that discipline or requires a related application.
  4. Confirm the permit set with city staff or the design team before paying for final drawings.
  5. Track related permit numbers together so a smaller approval does not hold up the project.

A local project example

A new house with sprinklers and new electrical service

The Town's permit packets identify separate electrical and fire-sprinkler authorities. Assign an applicant to each, alongside the Town's building and site applications.

A local decision clock is different from a typical duration. Ask which procedure applies and which applicant or outside-agency steps are not included.

This is a scope-planning example, not a permit determination. Open the official application packets below and describe the entire project to Hunts Point staff. Ask whether reviews can run together and which must finish first.

Build your permit responsibility sheet

Give each approval its own row. The useful output is a named person and a receipt, not a vague note that permits are being handled.

Track thisWhat to write down
Application and authorityExact permit type, city or outside agency, official portal and related permit numbers.
Owner and deliverableWho prepares the drawings, who submits, who pays and who responds to corrections.
DependencyWhat is needed before submission, before issuance and before the relevant work starts.
EvidenceSubmission receipt, completeness confirmation, correction notice, issued plans and required inspections.
Next checkpointThe unresolved item, responsible person, agreed response date and date to follow up.

For example, “civil engineer to submit the revised drainage plan by Friday” is actionable. “Waiting on permits” is not. Agree who updates this sheet when the portal sends a notice to only one applicant.

What to ask before applying

Use this short request with a marked site plan and a scope summary:

We are planning [work] at [address and parcel]. The scope includes [structure, systems, trees, grading, utilities and street work]. Which applications are required? Which reviews are included in the main permit? Which separate approvals must finish before issuance? Please point us to the current submittal checklists and identify any outside agencies.

If a contractor says no permit is needed, ask which exemption applies to the specific work. A building-permit exemption does not by itself resolve zoning, tree, shoreline, utility or other requirements. Keep the written answer with the project documents.