BEBuild Eastside

Medina / permit types

The different types of permits in Medina

Medina separates building and system permits from grading, trees, right-of-way, construction activity, and land-use approvals. The city's consultant-supported review makes an early predevelopment meeting especially useful.

Reviewed against official Medina sources, August 2026

Official starting point: Medina permit forms. Match the full scope to the current city requirements before submitting.

One project can need more than one permit

A building permit does not automatically replace every trade, site, tree, fire, utility, right-of-way, or land-use approval. List the whole scope first, then confirm which reviews are combined and which require separate records.

Major permit families

Building

Construction and structural changes.

Common examples: New houses, additions, remodels, reroofs, fences, and demolition.Medina permit forms
Mechanical, gas, and plumbing

System permits required for covered equipment, piping, and fixtures.

Common examples: Furnaces, air conditioning, heat pumps, gas lines, water service, drains, and fixtures.Medina permit FAQ
Grading and drainage

Site changes and stormwater work.

Common examples: Excavation, fill, drainage systems, erosion control, and retaining work.Medina permit forms
Tree activity

Removal, pruning, retention, and replacement under Medina's tree rules.

Common examples: Administrative tree work, hazardous trees, and development-related tree plans.Medina permit forms
Right-of-way and construction activity

Work or activity affecting public areas and larger construction impacts.

Common examples: Driveways, utility work, traffic control, staging, and construction activity permits.Medina permit forms
Land use and shoreline

Planning decisions separate from building-code approval.

Common examples: Variances, subdivisions, lot-line changes, shoreline permits, and conditional uses.Medina permit forms

How to choose the right combination

  1. Write the complete scope, including structural, system, site, tree, utility, access, and public-area work.
  2. Open the official source for every permit family that matches the scope.
  3. Check whether the primary permit includes that discipline or requires a related application.
  4. Confirm the permit set with city staff or the design team before paying for final drawings.
  5. Track related permit numbers together so a smaller approval does not hold up the project.