Kirkland grading, utilities, drainage, and right-of-way permits
The building permit does not automatically resolve the civil and public-infrastructure scope. Excavation, drainage, utilities, access, frontage, and right-of-way work can require related Public Works or Land Surface Modification permits.
Reviewed against official Kirkland sources · August 2026Define the whole site scope
- Cut, fill, export, retaining walls, and temporary erosion control.
- Stormwater facilities and discharge.
- Water and sewer service or meter work.
- Driveways, sidewalks, curb, gutter, planter strips, and street trees.
- Right-of-way dedication, easements, and temporary occupation.
Use one coordinated base plan
Architecture, civil, landscape, arborist, utility, and erosion-control documents should use the same survey, grades, trees, access, and utility assumptions.
Expect legal and closeout documents
Public Works activity can include sewer certification, maintenance agreements, improvement evaluations, securities, record drawings, and as-builts. Track these separately from plan approvals.
Action plan
What to do next
- 1
Inventory every site and frontage change.
- 2
Complete the Public Works improvement evaluation where applicable.
- 3
Coordinate drainage and utilities before freezing architecture.
- 4
List easements, agreements, securities, and certifications.
- 5
Track site inspections, record drawings, and release requirements.