Before paying for plans
Get a free first-pass feasibility study for your own address. See what may fit and what to confirm next.
Check my propertyIllustrative scenario · Bellevue
Follow a hypothetical Bellevue SR-4 rebuild through floor area, garage space, coverage, and setbacks before paying for plans.
This first pass assumes no special allowance. It has not screened the lot for trees, easements, critical areas, shoreline rules, or private restrictions.
| Check | Calculation | What it tells you |
|---|---|---|
| Base FAR ceiling | 10,000 × 0.50 + 2,000 × 0.30 = 5,600 sq ft | A ceiling on counted floor area. The garage is counted in this screen. |
| Desired counted floor area | 4,600 + 600 = 5,200 sq ft | 400 sq ft below the base FAR ceiling. Other counted areas may affect the final result. |
| Building coverage ceiling | 4,800 sq ft | Limits building coverage. Impervious and hard-surface limits are separate. |
| Rectangle after base setbacks | (80 − 15) × (150 − 20 − 20) = 7,150 sq ft | A geometric screen. This area does not override FAR, coverage, or site constraints. |
A 4,600 sq ft home plus a 600 sq ft enclosed garage uses 5,200 sq ft in this conservative one-dwelling FAR screen. That leaves 400 sq ft below the base ceiling. It does not establish an approved house size or an available footprint. A DADU, an attached ADU, or qualifying middle housing needs its own calculation.
Example published . Confirm the current code and any project-specific conditions with the City.
One-dwelling FAR tiers and the treatment of ADUs, parking, and middle housing.
SR-4 base setbacks and separate building, impervious, and hard-surface limits.
Use the actual property to confirm its mapped zone and site context.
Get a free first-pass feasibility study for your own address. See what may fit and what to confirm next.
Check my propertyCheck your permit’s status. Create a free account to get alerts when it changes.
Check and monitor my permit