Bellevue's residential zone tells you the starting setbacks and site limits, but it does not create the final building envelope. Corner lots, access routes, easements, critical areas, shoreline rules, overlays, and retained trees can all push construction farther inward.

Reviewed against official Bellevue sources in August 2026

Bellevue residential base-zone table

The city renamed many residential zones in 2025. Current and former names are shown together.

ZoneLot or densityFrontRearSide yardsCoverage
LL1 / LL-1 (formerly R-1)35,000 sq ft35 ft25 ft5 ft minimum each, 20 ft combined35% building; 45% impervious
LL2 / LL-2 (formerly R-1.8)20,000 sq ft30 ft25 ft5 ft minimum each, 15 ft combined35% building; 45% impervious
SR1 / SR-1 (formerly R-2.5)13,500 sq ft20 ft25 ft5 ft minimum each, 15 ft combined35% building; 45% impervious
SR2 / SR-2 (formerly R-3.5)10,000 sq ft20 ft25 ft5 ft minimum each, 15 ft combined35% building; 45% impervious
SR3 / SR-3 (formerly R-4)8,500 sq ft20 ft20 ft5 ft minimum each, 15 ft combined35% building; 45% impervious
SR4 / SR-4 (formerly R-5)7,200 sq ft20 ft20 ft5 ft minimum each, 15 ft combined40% building; 55% impervious
LDR1 / LDR-1 (formerly R-7.5)4,700 sq ft20 ft20 ft5 ft minimum each, 10 ft combined40% building; 55% impervious
LDR2 / LDR-2 (formerly R-10)10 homes per acre20 ft20 ft5 ft minimum each, 10 ft combined40% building; 65% impervious
LDR3 / LDR-3 (formerly R-15)15 homes per acre20 ft20 ft5 ft minimum each, 10 ft combined40% building; 65% impervious
MDR1 / MDR-1 (formerly R-20)20 homes per acre20 ft20 ft5 ft minimum each, 10 ft combined40% building; 65% impervious
MDR2 / MDR-2 (formerly R-30)30 homes per acre20 ft20 ft5 ft minimum each, 10 ft combined40% building; 65% impervious

Parcel-specific checks

What can change the table

  • The common base height screen for a house is 30 feet for a flat roof or 35 feet to a pitched-roof ridge, plus a 40-foot individual-facade cap. Confirm the measurement method and exceptions.
  • A required yard adjoining an access route is generally at least 10 feet. A corner lot can have more than one street-facing yard.
  • Building coverage, impervious surface, and hard surface are different calculations. Do not treat the largest percentage as the buildable footprint.
  • Middle-housing, multifamily, shoreline, critical-area, and overlay provisions may add standards not captured here.

How to use this guide

Turn a zone row into a useful screen

  1. 1

    Find the parcel on the city's current zoning map and copy the complete zone name.

  2. 2

    Read the full row, table footnotes, and definitions. Do not use only the front setback.

  3. 3

    Check corner-lot yards, access easements, critical areas, shorelines, trees, overlays, and recorded restrictions.

  4. 4

    Use a boundary and topographic survey to place the setbacks against the actual lot.

  5. 5

    Have the city or project team confirm any uncertainty before the design is fixed.