BEBuild Eastside

Before you buy a lot / Eastside, WA

How big a home can you build? Compare Eastside city rules

Two equally sized lots can support very different homes. Start with the size and shape of the house you want, then compare the rules that could stop it from fitting.

10 minute read14 citiesReviewed

Compare the rules in the right order.

1. Where can it sit?

Setbacks, protected trees, slopes and easements define the usable shape. A wide single-story house needs more footprint than a compact two-story home.

2. How much can you enclose?

FAR or gross floor area limits count space across floors. Garages, basements, covered spaces and tall rooms may count differently by city.

3. What else needs room?

Driveways, patios, drainage, landscaping and access share the lot. Passing a building-coverage test does not mean the whole site works.

Start with the glossary for FAR, lot coverage, impervious surface and other terms →

Compare critical area buffers and their effect on usable land →

Height and setbacks across 14 cities

These are named residential examples for a principal custom home. They are not citywide maxima or ADU, middle-housing, shoreline or critical-area standards. All yard dimensions are in feet. A mailing address is not proof of municipal jurisdiction.

Representative height and yard requirements. Follow the city link for important qualifications.
City and exampleHeightSetbacks
BellevueSR-2 (formerly R-3.5), one house30 ft flat roof; 35 ft pitched roof20 ft front; 25 ft rear; sides 5 ft minimum each and 15 ft combined
KirklandRS 8.5 and RSX 8.5, one houseRS: 25 ft; RSX: 30 ft above average building elevation20 ft front; 10 ft rear; sides 5 ft minimum. RS also requires 15 ft combined
Clyde HillR-1, lot at least 15,000 sq ft25 ft above original grade30 ft front; 35 ft rear; 15 ft each side
MedinaR-16, illustrative 16,000 sq ft lot25 ft original / 28 ft finished grade; lower applicable cap controls30 ft front/rear; 15 ft lower side; 20 ft upper side
Mercer IslandR-9.6, ordinary residential baseline30 ft base; grade method matters20 ft front; 25 ft rear; sides depend on width and facade height
RedmondNeighborhood Residential (NR), one dwelling38 ft base10 ft front; 5 ft rear; 3 ft interior side; 10 ft street side
BothellR-L1, no alley35 ft15 ft front/rear; 5 ft sides; parking structures need 20 ft from streets/access tracts
Beaux Arts VillageResidential district30 ft above existing grade20 ft front; 25 ft rear; 10 ft sides
Hunts PointR-20, nonwaterfront principal home26 ft original-grade reference / 32 ft finished grade; both apply40 ft front; 35 ft rear; 10 ft sides, before height-plane adjustments
IssaquahSF-S baseline30 ft20 ft front; 10 ft rear; 8 ft sides
NewcastleR-4 baseline30 ft10 ft front; 20 ft rear; 5 ft sides
SammamishR-4, building over 4,000 sq ft35 ft25 ft front/rear; 10 ft sides for this building-size tier
Yarrow PointR-12 or R-15, ordinary interior parcel25 ft original / 31 ft finished grade; both apply25 ft street/private lane; 10 ft ordinary private-property lines
WoodinvilleR-4, lot 5,000 through 43,559 sq ft35 ft10 ft street; 5 ft interior; street-facing garage generally needs 20 ft driveway

Floor area, coverage and surface limits

Read across each row. The limits operate together. “No base FAR” means the cited residential table does not impose that ratio. It does not mean unlimited floor area. “Confirm” means we have not supplied a universal numerical allowance.

Same city examples as the height table. Percentages use each city's own definitions and eligible lot area.
CityFAR / total floor areaBuilding or lot coverageImpervious / other surfaces
Bellevue0.50 on first 10,000 sq ft; 0.30 on additional lot area35% structures45% impervious; 75% hard surface
Kirkland0.50 base FAR50% lot coverage, including qualifying hard surfacesDo not treat 50% as building footprint plus a separate paving allowance
Clyde HillNo general R-1 FAR stated30% structural60% impervious
MedinaNo base residential FAR stated25% structural for this example55% impervious for this example
Mercer IslandLesser of 40% of net lot area or 8,000 sq ft40%, 35%, 30% or 20%, depending on average lot slopeSeparate 9% hardscape allowance; unused coverage may transfer under code
RedmondNo base FAR, but 4,500 sq ft total GFA cap for one dwelling50% buildings for one dwelling70% impervious
BothellNo base FAR in residential tableNo separate building percentage in base table55% hard surface
Beaux Arts Village0.35 GFAR; 7,000 sq ft maximum structure-area cap30% structures50% total lot coverage
Hunts PointGreater of 5,200 sq ft or 25% of lot areaNo universal building ratio used hereConfirm site-development and drainage limits
IssaquahNo base detached-home FAR in this tableNo separate building percentage in base table40% impervious
NewcastleNo base R-4 FAR in table35% buildings40% impervious; 45% hard surface
Sammamish0.50 single-family FARNo separate house-footprint ratio in base table40% hardscape
Yarrow PointNo base residential FAR applied30% structure area60% impervious
WoodinvilleNo general base residential FAR35% buildings for this lot-size tierLandscaping and drainage rules apply separately

A 20,000 sq ft lot does not give you the same floor-area budget.

Illustration only: one dwelling, the stated zones, and 20,000 sq ft of eligible lot area. For Mercer Island, that means net lot area. These are counted floor-area limits before testing the footprint, roof, trees or site constraints. They are not promised living area.

Bellevue / SR-28,000 sq ft

10,000 × 0.50 + 10,000 × 0.30.

Kirkland / RS 8.510,000 sq ft

20,000 × 0.50 base FAR.

Mercer Island / R-9.68,000 sq ft

20,000 × 0.40, subject to the 8,000 sq ft zone cap.

Redmond / NR4,500 sq ft

One-dwelling total GFA cap. Below-grade space counts.

For a 6,000 sq ft dream home, define whether that includes the garage and basement first. Ask an architect to translate your living-space goal into each city's counted area. A higher number in this example does not establish a better lot.

Important qualifications and city guides

Use these details to narrow your search, then open the full guide for every district and its footnotes.

Bellevue

FAR counts the enclosed garage. Coverage, impervious and hard surface are separate limits. Other zones and housing configurations differ.

All Bellevue zoning and setback details →

Kirkland

The RS versus RSX distinction changes height and side yards. Larger-lot zones can have lower FAR. Apply coverage definitions and any approved surface credits.

All Kirkland zoning and setback details →

Clyde Hill

Smaller existing lots use different side yards and upper-story angle planes. No FAR does not override coverage, grade or setbacks.

All Clyde Hill zoning and setback details →

Medina

Coverage changes with zone and actual lot size. Other zones use different height planes. Medina Heights has a 20 ft overlay limit. Interim standards require rechecking.

All Medina zoning and setback details →

Mercer Island

The floor-area cap changes by zone. Lot coverage includes driving surfaces, not just buildings. Use net lot area, not automatically the assessor's gross area.

All Mercer Island zoning and setback details →

Redmond

The cap covers all structures and counts below-grade floor area. More dwellings use a different cap. The 60% coverage path requires qualifying multiple dwellings.

All Redmond zoning and setback details →

Bothell

R-L2 has 60% hard surface; R-C has 35%. Critical areas can impose additional impervious limits. Verify the current residential zoning designation.

All Bothell zoning and setback details →

Beaux Arts Village

Garages, carports and accessory buildings count toward the structure-area limit. GFAR, structural coverage and total lot coverage are separate tests.

All Beaux Arts Village zoning and setback details →

Hunts Point

R-40 uses tiered floor-area formulas. Waterfront yards and optional height paths differ. Missing percentages are not unlimited allowances.

All Hunts Point zoning and setback details →

Issaquah

SF-E has 30% impervious; SF-SL and SF-D have 50%. SF-D height is 25 ft or two stories, whichever is lower. Subareas and housing types differ.

All Issaquah zoning and setback details →

Newcastle

Passing building coverage alone is not enough. Hard and impervious limits are independent. Other zones can have substantially different percentages.

All Newcastle zoning and setback details →

Sammamish

R-4 and R-6 setbacks change with building area. Smaller-house yards cannot automatically be used for a larger custom home. FAR exclusions need their own check.

All Sammamish zoning and setback details →

Yarrow Point

Shoreline, access, panhandle and between-dwelling distances need separate classification. Both grade limits must work.

All Yarrow Point zoning and setback details →

Woodinville

Building coverage changes with both zone and lot area. R-1 steps down to 15% at one acre or more. Verify city limits, not just a Woodinville mailing address.

All Woodinville zoning and setback details →

Practical worksheet

Put this guide to work

Worksheet updated . This is a planning example. Regulatory sources and data have their own dates.

Use three separate drawings and calculations

Illustration only: a 10,000-square-foot qualifying lot with a 0.50 FAR would permit 5,000 square feet of counted floor area. A hypothetical 35% building-coverage cap would allow a 3,500-square-foot footprint. Those are different ceilings, not two allowances to add together. This example does not assign either ratio to your city or parcel.

Floor-area schedule
List each level, garage, ADU, basement and other space. Cite the local inclusion or exclusion rule beside any area you do not count.
Coverage and surface schedule
Calculate the footprint separately from all regulated hard or impervious surfaces. Include existing retained improvements and use the correct eligible lot area for each ratio.
Usable site plan
Place the building inside the actual yards, easements, critical areas, tree protections and access requirements. Show room for construction as well as the finished building.

A house can pass FAR and fail coverage. It can pass both and still have no workable driveway or excavation area. Review the three documents together. Pervious paving, basements and garages do not receive the same treatment in every jurisdiction.

See definitions and calculation examples

Keep comparing before you choose.

Already submitted? Track your permit and know who needs to act next →