Free homeowner guides
What do you need help with?
Get help with a permit, plan a custom home or investigate a property. Start with your situation, then go deeper when you need to.
City searches include local articles and across-city planning guides. Check each guide's scope.
Not sure where to start?
Choose your situation.
My permit is taking too long
Understand the hold-up, find the next task and follow up with the right person.
- What to do when your permit is stuckFind the next task and use a focused follow-up email.
- Read your permit's reviews and statusUnderstand what the official portal is telling you.
- Put the wait in contextCompare observed Bellevue and Kirkland permit timing.
I'm preparing a permit application
Understand the process, gather useful records and prepare your project team.
- Understand the permit process and portalsKnow where applications, reviews and inspections happen.
- Know which professionals you needSeparate the roles of your architect, engineers and city reviewers.
- Find existing plans and building recordsCollect the drawings and site history that can inform your application.
I want to build a custom home
No lot or city picked yet? Start with the roadmap, complete budget and full timeline.
- Start with the custom home roadmapKnow which decisions come first, from choosing land to moving in.
- Understand the complete project budgetA Bellevue-focused guide with categories you can use across the Eastside.
- Plan the full homebuilding timelineSeparate design, permit time, construction and closeout.
I'm looking for a lot
Compare locations and investigate the restrictions that could change your plans.
- What to check before buying landStart with a practical property due-diligence checklist.
- Compare how much you can buildSee how setbacks, height and coverage differ across Eastside cities.
- Check easements, HOA rules and restrictionsLook beyond zoning before committing to a property.
I'm designing and budgeting
Make the big decisions early and build a budget that includes more than the house.
- Prepare before you hire an architectTurn your priorities, scope and budget into a useful design brief.
- Budget the site costs often left outAccount for utilities, drainage, access and other site work.
- Learn from real house floor plansFind public drawings and turn examples into a useful design brief.
I'm choosing a builder or starting construction
Compare the scope, plan site work and keep approvals aligned with construction.
- Choose a builder beyond priceCheck relevant experience, supervision, communication and references.
- Compare builder bids and change ordersCheck allowances, exclusions and how changes will be approved.
- Confirm who is pricing the site workFind missing scope and overlapping costs before work starts.
- Confirm what stays and what gets rebuiltAlign demolition, retained structure and the permitted scope.
The guide library
Builders and construction
Compare the scope, plan site work and keep approvals aligned with construction.
Browse all topics with these filtersShowing 1 to 12 of 21 guides
- Read guide →
The site costs a custom-home quote often leaves out
Build a complete Eastside custom-home site budget covering utilities, drainage, grading, retaining walls, frontage, fire access, permits and construction logistics.
- Read guide →
Teardown, addition or major remodel? How to compare the options
Compare rebuilding and major remodeling on an Eastside lot. Evaluate retained structure, nonconformities, site rules, investigations, scope changes and complete project budgets.
- Read guide →
How to choose a custom-home builder beyond price
Compare custom-home builders on relevant experience, site supervision, communication, subcontractors and references. Use practical interview and job-site questions.
- Read guide →
How to compare builder bids and control change orders
Compare custom-home builder bids on equal scope. Understand allowances, exclusions, fixed-price and cost-plus terms, payment checkpoints and written change orders in WA.
- Read guide →
Your Bellevue permit is Ready to Issue. What now?
Learn what Ready to Issue means for a Bellevue building permit and what owners should check before issuance.
- Read guide →
Your Kirkland permit is Ready to Issue. What now?
Check Kirkland permit fees, contractor licensing, holds, and final owner steps before issuance.
- Read guide →
Bellevue Permit Inspections: Schedule and Check Results
Schedule Bellevue building and trade inspections on MyBuildingPermit, check today's inspector and posted results, prepare the site, and close every related permit.
- Read guide →
Bellevue electrical, mechanical, and plumbing permits for homeowners
Know when a Bellevue home project needs separate electrical, mechanical, plumbing, solar, or fire-protection permits.
- Read guide →
Demolishing a house in Bellevue: permits and sequencing
A practical Bellevue house-demolition guide covering the BE permit, utility disconnections, right-of-way work, erosion control, trees, and waste.
- Read guide →
Bellevue home additions and deck permits: the practical checklist
Plan a Bellevue addition, detached structure, deck, pool, or retaining wall with the right BR or BS permit and supporting documents.
- Read guide →
Kirkland Permit Inspections: Schedule and Check Results
Schedule a Kirkland permit inspection on MyBuildingPermit, check the day's schedule and posted results, clear corrections, and confirm every related permit is final.
- Read guide →
Kirkland electrical, mechanical, plumbing, and fire permits
Coordinate Kirkland trade and fire permits, plan review, licensed contractors, and inspections with the main building permit.